Rockledge
Re-Use Water System Upgrade
Rockledge, Florida
Project Data:
Capacity
- Capacity – 14 mgd (10,000gpm) total station flow with 4 (four) pumps running at build-out.
Prefabricated, factory-built skids two (2), booster pump re-use water system upgrades: Skid 1 – with 4 (four) two stage 150 HP – 1800 RPM pumps with 150# discharge head pressure; Skid 2 – (not pictured) with two (2) 6-stage 20-HP – 1800 RPM pumps with 150# discharge head pressure.
Booster Station Design: Engineered Fluid, Inc. d.b.a EFI-Solutions
Installed Date: 4/11/05
Participants:
Owner – City of Rockledge, Florida, 321-690-3975
Contractor – Direct Purchase from EFI including on-site station installation.
Consulting Engineer – Jones, Edmunds & Associates, Inc., Gainsville, Florida, 352-377-5821
EFI Contacts – Applications Engineer, 618-533-1351, [email protected]