North Pointe

Factory-Built Booster Pump Station

Lake Havasu City, Arizona

Project Data:

Project Scope: : Transmit water into a new home development of approximately 120 single family homes with potential for growth.

Capacity

  • 3.2 MGD (2250 GPM) total station flow with five pumps running.

Prefabricated, Factory-Built Booster Pump Station with stand-by engine generator set; 120 connected horsepower for 5 end suction pumps, one 50-GPM, one 200-GPM, two 500-GPM and one 1000-GPM; with all mechanical components and systems installed in a 12’-0” x 29’ – 0” x 8’ – 6” building with base structure.

Booster Station Design: Engineered Fluid, Inc. d.b.a EFI-Solutions

Installed Date:    11/28/06

 

Participants:

Owner – Arizona American Water Co., Peoria, AZ 623-445-2409

Installing Contractor – Atlantis Construction & Development, 928-759-3855

Consulting Engineer – Morrison-Maierle, Inc., 480-517-5800

EFI Contacts – Applications Engineer, 618-533-1351, [email protected]

 

North Pointe