Joplin
Raw Water Pump Station
Project Data:
Project Scope: Transmit raw water from the Shoal Creek intake structure to the water treatment intake point.
Capacity
- 36.0 MGD at total station flow with five pumps installed at build-out.
Prefabricated, Factory-Built Duplex (2 buildings connected), Booster Pump Station with five installed raw water pumps, and one future raw water pump: two 5560-GPM, one 4170-GPM, two 2780-GPM with one 4170-GPM for future addition; 2200 HP on 4160 volt service with all mechanical components and electrical systems installed in two, 14’- 0” x 47’ – 0” x 11’ – 6” buildings with base structure.
Booster Station Design: Engineered Fluid, Inc. d.b.a EFI-Solutions
Installed Date: February 2007
Participants:
Owner – Missouri American Water Co., 417-626-8509, [email protected]
Consulting Engineer -Black & Veatch, St. Louis Office
EFI Contacts – Applications Engineer, 618-533-1351, [email protected]