Henderson P-8

Factory-Built Booster Pump Station

Henderson, Nevada

Project Data:

Project Scope: Part of the City of Henderson utilities network of pump stations and reservoirs. This station transfers water from a ground storage tank to another ground storage tank at a different gradient level.

Capacity

  • 10.8 MGD (2500 GPM) with three pumps running.

Prefabricated, factory-built skid pump station with three (3) pumps, with space for a future forth pump. The suction piping is located within the basement gallery due to site layout of the ground storage tank. The entire package was off loaded and re-assembled within 20 working hours.

Booster Station Design: Engineered Fluid, Inc. d.b.a EFI-Solutions

Installed Date: 2/15/08

Participants:

Owner – City of Henderson, NV 702-565-2803

Contractor – Contri Construction Co., Inc., Las Vegas, NV, 702-458-6004

Consulting Engineer – Carollo Engineers, Las Vegas, NV, 702-792-3711

EFI Contacts – Applications Engineer, 618-533-1351, [email protected]

 

Henderson P8