Hopewell
MORE INFORMATION ON THIS JOB TO COME SOON! Project Data: Capacity Capacity – * mgd (*gpm) total station flow with * pumps running at build-out. Prefabricated, factory-built Booster Station Design: Installed Date: *** date *** Participants: Owner – *** Contractor – *** Consulting Engineer – *** EFI Contacts – ***
Read MoreGreene Co
MORE INFORMATION ON THIS JOB TO COME SOON! Project Data: Capacity Capacity – * mgd (*gpm) total station flow with * pumps running at build-out. Prefabricated, factory-built Booster Station Design: Installed Date: *** date *** Participants: Owner – *** Contractor – *** Consulting Engineer – *** EFI Contacts – ***
Read MoreSomerset Co, PA
MORE INFORMATION ON THIS JOB TO COME SOON! Project Data: Capacity Capacity – * mgd (*gpm) total station flow with * pumps running at build-out. Prefabricated, factory-built Booster Station Design: Installed Date: *** date *** Participants: Owner – *** Contractor – *** Consulting Engineer – *** EFI Contacts – ***
Read MoreOhio River
INDUSTRIAL SERVICE WATER PROJECT Ohio River Capacity 34.5 MGD with FIVE pumps running. Prefabricated booster pump station was delivered in five sections, three lower sections and two upper sections. The lower sections house the stirring valves, pumps, air purge system and storage. The upper sections contain a control room and catwalk to service the pump…
Read MoreRockledge
Project Data: Capacity Capacity – 14 mgd (10,000gpm) total station flow with 4 (four) pumps running at build-out. Prefabricated, factory-built skids two (2), booster pump re-use water system upgrades: Skid 1 – with 4 (four) two stage 150 HP – 1800 RPM pumps with 150# discharge head pressure; Skid 2 – (not pictured) with two…
Read MoreRancho Santa Fe
Project Data: Project Scope: Transmit water to 5000 homes in the Olivenhain MWD, taking water from one water zone reservoir and pumping it to a second reservoir. Capacity 15.8 MGD (11,025 GPM) total station flow with three pumps running. Prefabricated, Factory-Built, three separate skid booster pump stations with 220-PSI discharge pressure from vertical turbine pumps.…
Read MoreNorth Pointe
Project Data: Project Scope: : Transmit water into a new home development of approximately 120 single family homes with potential for growth. Capacity 3.2 MGD (2250 GPM) total station flow with five pumps running. Prefabricated, Factory-Built Booster Pump Station with stand-by engine generator set; 120 connected horsepower for 5 end suction pumps, one 50-GPM, one…
Read MoreJoplin
Project Data: Project Scope: Transmit raw water from the Shoal Creek intake structure to the water treatment intake point. Capacity 36.0 MGD at total station flow with five pumps installed at build-out. Prefabricated, Factory-Built Duplex (2 buildings connected), Booster Pump Station with five installed raw water pumps, and one future raw water pump: two 5560-GPM,…
Read MoreHenderson P-8
Project Data: Project Scope: Part of the City of Henderson utilities network of pump stations and reservoirs. This station transfers water from a ground storage tank to another ground storage tank at a different gradient level. Capacity 10.8 MGD (2500 GPM) with three pumps running. Prefabricated, factory-built skid pump station with three (3) pumps, with…
Read MoreHenderson P-21
Project Data: Project Scope: Part of the City of Henderson utilities network of pump stations and reservoirs. This station transfers water from a ground storage tank to another ground storage tank at a different gradient level. Capacity 26.3 MGD (18,296 GPM) Prefabricated, Factory-Built skid pump station with four (4) pumps with 250 HP, 18 pulse…
Read More